DSC

Bath 80 Gallery

The powder room was converted into a full functional bath to accommodate a shower with a hand held showers and with beautiful decorative tile and niches. Comfort height vanity with a vessel sink, comfort height toilet and also a window above to enhance the lighting.

Bath 80 Gallery Read More »

b

Bath 81 Gallery

This 30yr old home needed some updating in the bathroom. One of main concerns for this homeowner was being able to enlarge the shower. We moved 24 inches in to the bedroom we reshaped the shower to make the space more functional. All new oil rub bronze finished was used for all the fixtures to

Bath 81 Gallery Read More »

b

Bath 82 Gallery

This pull and replaced bathroom was done to update to a new look by taking out the old corner tub and replacing it with a new napoleon style soaker tub, we changed the vanities to comfort height with more draws for storage and better organization. We installed recessed lights with dimmers to enhance the lighting.

Bath 82 Gallery Read More »

b

Bath 83 Gallery

This bathroom was part of total two story addition project that got designed and built by MNCK . The second story consisted of Master bedroom and sitting room suite, Master bathroom and adjacent Laundry room and walk in closets. The new master bathroom consist of a large two person whirlpool, large all tiled shower stall,

Bath 83 Gallery Read More »

b

Bath 84 Gallery

This narrow outdated bathroom was enhanced with a new tub with grab bar and separate shower that is equipped with hand held showers, niches, grab bar and beautiful decorative tile. Vanities and toilet were installed as comfort height. Vanity lights and recessed lighting gave this room better visibility.

Bath 84 Gallery Read More »

Delew kit rt

Kitchen 240

1980 home in heart of Oakton, VA occupied by young couple and their three children. They have lived four years in this house and as kids grow up and their karate, soccer, tutoring, piano and other activities growing as well which made their home looks more cramped than ever. It all began with front foyer

Kitchen 240 Read More »

b

Bath 85 Gallery

The 1990 single family home in Ashburn, VA has inherited a long and narrow master bathroom and a connected long walk in closet. The fact that the laundry room was on main floor has had a big burden on their everyday chores. We have designed to relocate the laundry room into walk in closet off

Bath 85 Gallery Read More »

Dunn kit rt

Kitchen 241

1990 home in heart of town of Vienna recently has been bought by a young couple. They had a different vision for their kitchen and what they have bought into was not it. Our design team met up with the couple and proposed total overhaul. Relocating the stove, sink and appliance locations. Getting rid of

Kitchen 241 Read More »

Bathroom Remodeling Fairfax, VA

Bath 86 Gallery

This project was part of total finishing of an empty basement. All plumbing and electrical have been brought in to a spot in basement that is adjacent to a bedroom and second door to main basement. This bathroom consists of a large shower and deck mounted large whirlpool with decorative tile surround for customer use

Bath 86 Gallery Read More »

Farnum kit L Seat

Kitchen 242

This townhouse is located in Historic part of Old town Alexandria with at least 130 years of its history. The house was renovated several times over different periods. A 1980’s addition was added to back of the kitchen. This meant, the kitchen was pretty run down and needed to be updated for the homeowners. The

Kitchen 242 Read More »

Scroll to Top